PV System (SOLAR)

Service Details

WHAT IS NET ENERGY METERING (“NEM 3.0”)

“The mechanism where a NEM 3.0 Consumer installed a solar PV Installation on the roof-top of his Premise primarily for his own use. During the first ten (10) years of operation, any excess Energy which is not consumed due to operational constraints or monthly or seasonal variation in load demands at the said Premise may be exported to the Distribution System. The credit to be received for such excess Energy may be used to offset part of the electricity bill for Energy provided by the Distribution Licensee during the applicable Billing Period.”

NEM 3.0 DELIVERING A GREENER FUTURE

Seize the opportunity now as there are available quotas up for grab!

The Government has introduced the Net Energy Metering Scheme in November 2016 with quota allocation of 500 MW up to year 2020 to encourage Malaysia’s Renewable Energy (RE) uptake. The concept of NEM is that the energy produced from the solar PV installation will be consumed first, and any excess will be exported to TNB at prevailing displaced cost.

As an effort to encourage the NEM uptake, the NEM 2.0 was introduced on 1st January 2019, and the true net energy metering concept was adopted, where it allows excess solar PV generated energy to be exported back to the grid on a “one-on-one” offset basis. The NEM scheme were executed by the Ministry of Energy and Natural Resources (KeTSA), regulated by the Energy Commission (EC), with Sustainable Energy Development Authority (SEDA) Malaysia as the implementing Agency (IA). The 500MW quota under the NEM 2.0 has been fully subscribed by 31st December 2020.

According to the media statement released by the YAB Minister of Energy Transition and Public Utilities on 26 January 2024, the Net Energy Metering (NEM) 3.0 program will continue with an additional quota offer of 100MW for NEM Rakyat and 300MW for NOVA. The NEM 3.0 quota offer period will run until December 2024 or until all quotas are allocated, whichever comes first.

Starting on Monday, 5th February 2024, at 11:00 am, you can apply for the additional quota online through the e-NEM system.

For any further inquiries, kindly email us atĀ info@caenergy.com.my

Contact Us for More Info.

Contact Us for More Info.

Contact Us for More Info.

Contact Us for More Info.

Contact Us for More Info.